Menu
Microsoft strongly encourages users to switch to a different browser than Internet Explorer as it no longer meets modern web and security standards. Therefore we cannot guarantee that our site fully works in Internet Explorer. You can use Chrome or Firefox instead.

Triumph Gold Announces 2020 Drill Results including Near-Surface Gold Discoveries and Extension of the High-Grade Goldstar Vein


November 14, 2017

Vancouver, B.C., January 26, 2021 Triumph Gold Corp. (TSX-V:TIG | OTCMKTS:TIGCF) (“Triumph Gold” or the Company”) is pleased to announce drill results from their flagship Freegold Mountain Project located in Yukon’s Dawson Range Gold District. The 2020 exploration program was focused on drill testing near-surface gold targets in the Revenue-Nucleus and Mount Freegold areas (PR20-07). Nine holes were drilled for a total of 2,068.52 metres (Table 3).

 

“The 2020 campaign was small but successful, with all nine holes returning significant gold intercepts in untested or under-explored areas” said John Anderson, Executive Chairman and CEO of Triumph Gold. “We are very happy with these discoveries that complement existing prospects and deposits of the Freegold Mountain Project.”

 

Technical Highlights1:

 

-          Within the Irene-Goldstar Epithermal Corridor, 2020 drilling successfully tested the down-dip extension of the Goldstar Vein and validated the continuity of the system with long step-outs (up to 570 metres) into untested portions of the corridor intersecting multiple parallel gold-rich zones. Results include:

  • Extension of the high-grade Goldstar Vein by over 85 metres down dip in IGC20-03 with
    • 1.59 g/t Au, 96 g/t Ag, and 2.3% Cu over 1.56m (152.00 to 153.56m), including 4.59 g/t Au, 200 g/t Ag, and 6.9% Cu over 0.50m (153.06 to 153.56m)
  • Extension of the Skarn Zone by 570 metres to the northwest in IGC20-01 with the intersection of near-surface high-grade gold and silver in massive magnetite assaying
    • 1.12 g/t Au and 15.6 g/t Ag over 7.23m (27.82 to 35.05m), including 7.49 g/t Au and 37 g/t Ag over 1m (33.00 to 34.00m)
  • Discovery of near-surface gold and silver rich zones in multiple holes along the Irene-Goldstar Epithermal Corridor including
    • 0.89 g/t Au, 22 g/t Ag, and 0.17% Cu over 9.75m (48.16 to 57.91m) in IGC20-01, including 1.47 g/t Au, 35 g/t Ag, 0.23% Cu, 0.05% Pb and 0.11% Zn over 5.58m (49.18 to 54.76m), and
    • 1.81 g/t Au and 8.6 g/t Ag over 7.62m (42.67 to 50.29m) in IGC20-02, including 2.87 g/t Au and 12 g/t Ag over 4.57m (42.67 to 47.24m)

-          In the Revenue-Nucleus Area, drilling outside of known porphyry copper-gold mineralization resulted in multiple intersections of greater than 1 g/t gold, as well as the discovery of gold within an oxidized zone in KZ20-02 with assays of:

  • 0.82 g/t Au over 12.27m (1.45 to 13.72m), including 2.2 g/t Au over 3.12m from surface (1.45 to 4.57m), within a larger interval of porphyry-style gold and copper mineralization

 

A video summary of today’s news release is available by clicking the following link:

2020 Exploration Highlights – Freegold Mountain Project

 

Details of Drill Results:

 

Irene-Goldstar Epithermal Corridor

 

Four drill holes, totalling 555.18 metres (Table 3), were drilled in the Mount Freegold area during 2020 exploration. Three of the four holes collared in previously undrilled portions of the Irene-Goldstar Epithermal Corridor, a 3.7 kilometre long zone of gold and silver rich epithermal and skarn mineralization associated with a major splay of the Big Creek Fault (first outlined in PR20-03).

 

Mineralization within the Corridor (Figure 1) was first identified near Mount Freegold in 1930 with erratic but significant gold-rich intercepts of the Skarn Zone (e.g. chip samples that returned up to 366 g/t Au and 106 g/t Ag over 5 metres) and the Goldstar Vein epithermal system. In 1989 C. A. Main estimated a mineral inventory for the Goldstar Vein at 123,000 tonnes of 4.21 g/t Au and 47.2 g/t Ag contained within a shallow pit approximately 250 metres long by 60 metres deep2. Prospecting 2.5 kilometres to the northwest of the Goldstar Vein led to the discovery of the Irene Vein in 2013, and inaugural drilling of the vein in 2018 outlined a mineralized strike length of at least 450 metres, with grades of up to 20.7 g/t Au over 0.70m (PR19-02). Limited prospecting and trenching between the Goldstar Vein and Irene Zone resulted in significant grab (e.g. 425 g/t Au and 321 g/t Ag) and chip sampling from trenches (e.g. 3.85 g/t Au and 103 g/t Ag over 2m) at the Red Fox/Vindicator Zone, strongly indicating continuity of this mineralized trend.

 

The 2020 drill program along the Irene-Goldstar Epithermal Corridor successfully tested the down-dip extent of the Goldstar Vein and demonstrated continuity of both skarn and epithermal vein styles of mineralization within the 2.5 km-long previously undrilled portion of the corridor.

 

Drill hole IGC20-03 tested beneath the known extent of the Goldstar vein and intersected 1.59 g/t Au, 96.04 g/t Ag, and 2.28% Cu over 1.56m at 152 metres depth extending the Goldstar Vein by at least 85 metres down dip (Figure 4). This intercept demonstrates continuity of the high-grade vein to depth, and presents an immediate opportunity for resource definition work along the Corridor.

 

Drill holes IGC20-01 and IGC20-02 form a fence across the Irene-Goldstar Epithermal Corridor at the Red Fox/Vindicator Zone and successfully extend gold, silver, and base metal mineralization within the corridor by at least 570 metres along strike from the nearest drill hole at the Goldstar Vein (Figure 2). IGC20-01 intersected massive magnetite at 33 metres depth, assaying 7.49 g/t Au and 37 g/t Ag over 1 metre, while testing a moderate magnetic response along the flanks of a prominent 870 metre magnetic not tested by drilling in this area (Figure 3).

 

Additional intersections of new epithermal gold and silver mineralization in all four 2020 drill holes support continuity of both gold-rich skarn and epithermal vein mineralization within the Corridor (e.g. values up to 2.87 g/t Au and 12.33 g/t Ag over 4.57m in IGC20-02). IGC20-04 also identified epithermal mineralization, returning 1.14 g/t Au and 10 g/t Ag over 1.02m, but terminated prematurely due to a catastrophic drill failure at the end of the program.

 

Of the 3.7 kilometre length of the corridor, less than 2 kilometres have currently been tested by drilling. Inaugural drill testing at the Red Fox/Vindicator Zone is strong evidence for continuity of mineralization through the entire corridor. Work in 2020 also included updating infrastructure in the area, which will allow for efficient access to untested portions of the corridor in 2021.

 

Table 1: Highlighted 2020 drill results from the Irene-Goldstar Corridor (Mount Freegold Area)

 

 

Jesse Halle, Vice President of Exploration for Triumph Gold commented Multi-gram gold and silver results from the southeastern and central portions of the Irene-Goldstar Epithermal Corridor provide ample incentive to continue exploration and definition of this long and fertile mineralized system. Elsewhere in the corridor, increased drill density has been the key to identifying higher grade sections of the system – with recent compilation and 3D modelling we are now able to explore more effectively and efficiently than ever before.”

 

Please follow the link to view entire original news:

https://www.triumphgoldcorp.com/triumph-gold-announces-2020-drill-results-including-near-surface-gold-discoveries-and-extension-of-the-high-grade-goldstar-vein/

 

Covid-19 Response

 

Triumph Gold is committed to the health and safety of its employees and contractors. With recommendations from the Yukon Government and Yukon Chamber of Mines, the Company developed and implemented infection prevention and control measures at the Freegold Mountain Project to help reduce and minimize the risk of potential COVID-19 transmission in the camp and related work sites. During the 2020 field campaign, employees, contractors, and visitors were regularly monitored for symptoms and required to adhere to federal and territorial regulations, as well as Company prevention policies outlined in the Triumph Gold Corp COVID-19 Operational and Emergency Response Plans. Visitors and cross-shifts were not permitted during the field program, and camp employees and service providers were sourced from Yukon, with the exception of Triumph Gold corporate management who strictly followed regulations and guidelines upon entering the Territory).

 

Sampling Methods and Qualified Person

 

Drill core samples ranged between 0.5 and 2 metres length and were cut at Triumph Gold’s core logging facility at the Freegold Mountain Project. The samples were analyzed by SGS Canada of Vancouver, British Columbia. They were prepared for analysis according to SGS method PRP89: each sample was crushed to 75% passing 2mm and a 250g split was pulverized to better than 85% passing 75 micron mesh. Gold was tested by fire assay with atomic absorption finish on a 30g nominal sample (method GE_FAA30V5), and samples that tested over 10 g/t Au were retested using a 50g sample and a gravimetric technique. Additional 33 elements were tested by ICP-AES using a four-acid digestion (method GE_ICP40Q12), over-limit samples for copper were retested using the same technique, but with ore grade four acid digestion and a higher range of detection (method GO_ICP42Q100). Quality assurance and control (QAQC) is maintained at the lab through rigorous use of internal standards, blanks and duplicates. An additional QAQC program was administered by Triumph Gold: A minimum of three quality control samples, consisting of blanks, certified reference standards and duplicates, are blindly inserted into each 75 sample batch. QAQC samples that return unacceptable values trigger investigations into the results and reanalysis of samples that were tested in the batch with the failed QAQC sample.

 

The technical content of this news release has been reviewed and approved by Jesse Halle, P.Geo., Vice President Exploration for the Company and qualified person as defined by National Instrument 43-101.

 

Notes

 

1 Reported assays are uncut length-weighted averages and represent drilled core lengths. The true width of reported mineralization is unknown.

2 C.A. Main (1989) estimate should not be relied upon, as a Qualified Person has not done sufficient work to classify the estimate as a current mineral resource.

3 Gold equivalent [AuEq] is used for illustrative purposes, to express the combined value of gold, silver, copper, molybdenum, and tungsten as a percentage of gold for the Revenue-Nucleus area (porphyry related) and gold, silver, copper, lead, and zinc as a percentage of gold for the Mount Freegold Area (epithermal related). The lower detection limit for silver in assay package GE_ICP40Q12 is 2 g/t, therefore any samples that returned <2g/t have been excluded from all AuEq calculations. No allowances have been made for recovery loss that would occur in a mining scenario. AuEq is calculated on the basis of US$1,500 per troy ounce of gold (Au), US$18.00 per troy ounce of silver (Ag), US$3.00 per pound of copper (Cu), US$9.00 per pound of molybdenum (Mo), US$1.00 per pound of lead (Pb), US$1.25 per pound of Zinc (Zn), and US$13.00 per pound of tungsten (W).

4    Table coordinates presented in NAD83 (Zone 8N); Azimuths presented relative to UTM Grid.

 

About Triumph Gold Corp.

 

Triumph Gold Corp. is a Canadian based, growth-oriented gold exploration and development company with a district scale land package in mining friendly Yukon. The Company’s 100% owned, road accessible, flagship Freegold Mountain Project is located in the Dawson Range and is host to three NI 43-101 Mineral Deposits. The Project covers an extensive section of the Big Creek Fault zone, a structure directly related to epithermal gold and silver mineralization as well as gold-rich porphyry copper mineralization. The Company, led by an experienced management team, is focused on creating value through the advancement of its strategic “gold first” exploration program. For more information, please visit triumphgoldcorp.com.

 

On behalf of the Board of Directors

 

 Signed “John Anderson"

John Anderson, Executive Chairman and Interim CEO

 

 

For further information please contact:

John Anderson, Executive Chairman

Triumph Gold Corp.

(604) 218-7400

[email protected]

 

Nancy Massicotte

IR Pro Communications Inc.

(604) 507-3377

[email protected]

 

Mars Investor Relations

(647) 557-6651

[email protected]

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

This news release contains forward-looking information, which involves known and unknown risks, uncertainties and other factors that may cause actual events to differ materially from current expectation. Important factors - including the availability of funds, the results of financing efforts, the completion of due diligence and the results of exploration activities - that could cause actual results to differ materially from the Company's expectations are disclosed in the Company's documents filed from time to time on SEDAR (see www.sedar.com). Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release.  The company disclaims any intention or obligation, except to the extent required by law, to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

Triumph Gold Corp. Stock

€0.15
-0.680%
Triumph Gold Corp. shows a slight decrease today, losing -€0.001 (-0.680%) compared to yesterday.

Like: 0
Share

Comments