Menu
Microsoft strongly encourages users to switch to a different browser than Internet Explorer as it no longer meets modern web and security standards. Therefore we cannot guarantee that our site fully works in Internet Explorer. You can use Chrome or Firefox instead.

Polymetal: Kutyn construction approval


Polymetal International plc (POLY)
Polymetal: Kutyn construction approval

06-Oct-2020 / 09:00 MSK
Dissemination of a Regulatory Announcement, transmitted by EQS Group.
The issuer is solely responsible for the content of this announcement.


Release time

IMMEDIATE                        LSE, MOEX, AIX: POLY / ADR: AUCOY

Date

6 October 2020

 

 

Polymetal International plc

Kutyn construction approval

Polymetal announces that the Board of Directors has approved construction of the US$ 80 million Kutyn project.

"After thorough evaluation the Board has concluded that Kutyn belongs in Polymetal's asset portfolio. The key factors behind this decision are quick and capital-light path to significant free cash flows as well as potential for a long mine life as a part of the Albazino hub", said Vitaly Nesis, CEO of Polymetal.

PROJECT Highlights

  • JORC-compliant Ore Reserves for Kutyn (using US$ 1,300/oz gold price) as at 1 October 2019 are estimated at 8.4 Mt of oxide ore with an average grade of 3.0 g/t containing 0.812 Moz of gold (please see our recent press release for more details at the link).
  • Conventional open-pit mining will commence with pre-stripping in Q3 2021, with first ore mined in Q1 2022. The average life-of-mine (LOM) stripping ratio is 8 t/t. Ore will be processed through the 1.3 Mtpa heap leach facility followed by the Merrill-Crowe process. Average LOM gold recovery is 71%.
  • LOM gold production is expected to comprise 575 Koz. Average annual output from 2023 to 2028 is estimated at roughly 90 Koz with an average AISC of US$ 590/oz. First gold is expected to be produced in Q2 2023.
  • Polymetal acquired the asset in February 2011 for US$ 65.5 million in shares (when the gold price stood at US$ 1,400/oz). The Company subsequently spent US$ 55 million on exploration and site infrastructure in 2012-1H 2020. Remaining initial project capital expenditures (from 2H 2020) are estimated at US$ 80 million.
  • Project IRR (net of sunk costs) stands at 29% at US$ 1,200/oz rising to 42% at US$ 1,500/oz. NPV is estimated at US$ 79 million and US$ 157 million at US$ 1,200/oz and US$ 1,500/oz gold price respectively.
  • Mineral Resources of Kutyn (additional to Ore Reserves) as at 1 October 2019 amount to 6.6 Mt of oxide and refractory ore for both open-pit and underground mining with an average grade of 3.7 g/t representing 0.785 Moz of gold contained.
  • Detailed in-house metallurgical studies confirmed viability of processing refractory ore from Kutyn at the Albazino concentrator with subsequent POX at Amursk. JORC-compliant estimate of refractory reserves is planned for Q1 2023 following completion of the extensive drilling campaign of 50 km and preparation of the feasibility study.
  • The asset's production and financial results will be reported as a part of Albazino-Amursk segment.
  • The development of Kutyn will not result in changes to the current production and CapEx guidance. Incremental production from Kutyn will compensate for the decline at Albazino. Geotechnical conditions at Albazino underground are challenging and the management decided not to proceed with the project to double underground mining capacity to 1.2 Mtpa. CapEx reduction stemming from this decision will balance increased spending at Kutyn. Albazino mill will continue to have 100% utilization thanks to the introduction of low-grade historic stockpiles into the feed.

ABOUT KUTYN

Kutyn deposit is located in the Tugur-Chumikan District of the Khabarovsk Territory, Far East Russia, 114 km north-west of the Albazino mine. The Kutyn site can be accessed using a winter road from Albazino or by sea through the seasonal port of Ulban on the Sea of Okhotsk. The combined mining and exploration license covers an area of 120 km2.

Tugur-Chumikan District has a population of more than 2,500 people including 1,579 people of Indigenous Minorities of the North. The project will have positive social impacts in the region of operation as more than 300 new jobs covered by collective agreement will be created. Polymetal is also committed to contribute towards development of local communities via investments in infrastructure, running education programmes, sport and cultural events.

Kutyn will employ dry stacking of tailings, which is the safest tailings storage technology.

 

About Polymetal 

Polymetal International plc (together with its subsidiaries - "Polymetal", the "Company", or the "Group") is a top-10 global gold producer and top-5 global silver producer with assets in Russia and Kazakhstan. The Company combines strong growth with a robust dividend yield.

Enquiries

Media

 

Investor Relations

FTI Consulting

Leonid Fink

Viktor Pomichal

+44 20 3727 1000

Polymetal

Evgeny Monakhov

Timofey Kulakov

Kirill Kuznetsov

[email protected]

+44 20 7887 1475 (UK)

 

+7 812 334 3666 (Russia)

Joint Corporate Brokers

 

Morgan Stanley & Co. International plc

Andrew Foster

Richard Brown


Panmure Gordon

Daniel Norman

John Prior

+44 20 7425 8000

 

 

 

 

+44 20 7886 2500

RBC Europe Limited

Marcus Jackson

Jamil Miah

+44 20 7653 4000

Forward-looking statements

This release may include statements that are, or may be deemed to be, "forward-looking statements". These forward-looking statements speak only as at the date of this release. These forward-looking statements can be identified by the use of forward-looking terminology, including the words "targets", "believes", "expects", "aims", "intends", "will", "may", "anticipates", "would", "could" or "should" or similar expressions or, in each case their negative or other variations or by discussion of strategies, plans, objectives, goals, future events or intentions. These forward-looking statements all include matters that are not historical facts. By their nature, such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the company's control that could cause the actual results, performance or achievements of the company to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding the company's present and future business strategies and the environment in which the company will operate in the future. Forward-looking statements are not guarantees of future performance. There are many factors that could cause the company's actual results, performance or achievements to differ materially from those expressed in such forward-looking statements. The company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements contained herein to reflect any change in the company's expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based.

 

 



ISIN: JE00B6T5S470
Category Code: MSCM
TIDM: POLY
Sequence No.: 85459
EQS News ID: 1139022

 
End of Announcement EQS News Service

fncls.ssp?fn=show_t_gif&application_id=1139022&application_name=news&site_id=sharewise

Polymetal International plc Stock

€5.85
-38.540%
Polymetal International plc took a tumble today and lost €0.000 (-38.540%).

Like: 0
Share
EQS Group is a leading international provider of regulatory technology in the fields of corporate compliance and investor relations. In working with EQS Group, thousands of companies worldwide inspire trust by fulfilling complex national and international disclosure obligations, minimizing risks and communicating transparently with stakeholders.




Legal notice

Comments