Noram Receives Results for Cvz-79: High-Grade Intercept of 260.0 ft (79.2 M) Averaging 1185 ppm & High of 1660 ppm


Vancouver, British Columbia – June 16, 2022Sandy MacDougall, CEO of Noram Lithium Corp. (“Noram” or the “Company”) (TSXV: NRM | OTCQB: NRVTF | Frankfurt: N7R) is pleased to announce the successful completion of CVZ-79 (PH-05) and release of the final assay results. The Company completed core hole CVZ-79 at a depth of 503 ft (153.3 m). Sampling for assay began at 30 ft (9.1 m) and continued to the bottom of the hole, an interval thickness of 260.0 ft (79.2 m) was intersected from 100 ft (33.5 m) to 360 ft (109.7 m). The hole ended in mineralization and the weighted average lithium values present were as follows:

 

Depth of Interval Intersection

Total thickness

Weighted Average Lithium (ppm)

100 ft to 360 ft (33.5 m to 109.7 m)

260.0 ft (79.2 m)

1185.0 ppm

 

A picture containing old, dirty, trash

Description automatically generated

Figure 1. Example of core from CVZ-79; the interval from 124.0 to 129.5 ft (37.8 – 39.5 m). This particular section shows the transition from light olive claystones to the black reduced claystones. As a general rule, demonstrated by previous programs, the black claystones tend to have higher lithium values.

 

”CVZ-79 was one of the holes near the eastern edge of Noram’s Zeus property. At this location, it is anticipated that it will add substantially to Noram’s indicated lithium resource and will reassign a large portion of the current inferred resource into the indicated category. comments Brad Peek, VP of Exploration and geologist on all six phases of Noram’s Clayton Valley exploration drilling.

 

Chart, bar chart

Description automatically generated

Figure 2. Comparative stratigraphy and assay results for drill hole CVZ-79 as compared to CVZ-75 and CVZ-77, which were also drilled as part of the Phase IV program.  All 3 holes had long intercepts of high-grade lithium mineralization.  The histogram on the sides of the holes are the composited lithium grades in ppm Li.  The cross section has a 4X vertical exaggeration.

 

Map

Description automatically generated with low confidence

Figure 3 – Location of all past drill holes (Phase I to Phase V) previously completed in addition to the 12 holes completed during Phase V1. Phase VI holes are indicated in purple

 

Hole ID

From (ft)

To (ft)

From (m)

To (m)

Li (ppm)

CVZ-79

40

45

12.2

13.7

253

CVZ-79

45

50

13.7

15.2

411

CVZ-79

50

55

15.2

16.8

840

CVZ-79

55

60

16.8

18.3

930

CVZ-79

60

65

18.3

19.8

620

CVZ-79

65

70

19.8

21.3

650

CVZ-79

70

75

21.3

22.9

800

CVZ-79

75

80

22.9

24.4

810

CVZ-79

80

85

24.4

25.9

590

CVZ-79

85

90

25.9

27.4

920

CVZ-79

90

95

27.4

29.0

560

CVZ-79

95

100

29.0

30.5

730

CVZ-79

100

105

30.5

32.0

1260

CVZ-79

105

110

32.0

33.5

740

CVZ-79

110

115

33.5

35.1

880

CVZ-79

115

120

35.1

36.6

950

CVZ-79

120

125

36.6

38.1

890

CVZ-79

125

130

38.1

39.6

970

CVZ-79

130

135

39.6

41.1

1170

CVZ-79

135

140

41.1

42.7

980

CVZ-79

140

150

42.7

45.7

1040

CVZ-79

150

160

45.7

48.8

1070

CVZ-79

160

170

48.8

51.8

940

CVZ-79

170

180

51.8

54.9

1480

CVZ-79

180

190

54.9

57.9

1430

CVZ-79

190

200

57.9

61.0

1190

CVZ-79

200

210

61.0

64.0

1520

CVZ-79

210

220

64.0

67.1

1640

CVZ-79

220

230

67.1

70.1

1660

CVZ-79

230

240

70.1

73.2

1580

CVZ-79

240

250

73.2

76.2

1240

CVZ-79

250

260

76.2

79.2

1280

CVZ-79

260

270

79.2

82.3

1520

CVZ-79

270

280

82.3

85.3

1480

CVZ-79

280

290

85.3

88.4

1150

CVZ-79

290

300

88.4

91.4

1050

CVZ-79

300

310

91.4

94.5

1010

CVZ-79

310

320

94.5

97.5

990

CVZ-79

320

330

97.5

100.6

1020

CVZ-79

330

340

100.6

103.6

910

CVZ-79

340

350

103.6

106.7

700

CVZ-79

350

360

106.7

109.7

990

CVZ-79

360

370

109.7

112.8

720

CVZ-79

370

380

112.8

115.8

510

CVZ-79

380

390

115.8

118.9

650

CVZ-79

390

400

118.9

121.9

560

CVZ-79

400

410

121.9

125.0

650

CVZ-79

410

420

125.0

128.0

730

CVZ-79

420

430

128.0

131.1

700

CVZ-79

430

440

131.1

134.1

850

CVZ-79

440

450

134.1

137.2

830

CVZ-79

450

460

137.2

140.2

730

CVZ-79

460

470

140.2

143.3

500

CVZ-79

470

480

143.3

146.3

820

CVZ-79

480

490

146.3

149.4

520

CVZ-79

490

497

149.4

151.5

500

CVZ-79

497

503

151.5

153.3

550

 

Table 1 – Sample results from CVZ-79 from 40 ft (12.2 m) to a total depth of 503 ft (153.3 m).

 

The samples were analyzed by the ALS laboratory in Reno, Nevada. QA/QC samples were included in the sample batch and returned values that were within their expected ranges. 

 

The technical information contained in this news release has been reviewed and approved by Brad Peek., M.Sc., CPG, who is a Qualified Person with respect to Noram’s Clayton Valley Lithium Project as defined under National Instrument 43-101.

 

About Noram Lithium Corp.

Noram Lithium Corp. (TSXV: NRM | OTCQB: NRVTF | Frankfurt: N7R) is a well-financed Canadian based advanced Lithium development stage company with less than 90 million shares issued and a fully funded treasury. Noram is aggressively advancing its Zeus Lithium Project in Nevada from the development-stage level through the completion of a Pre-Feasibility Study in 2022.

 

The Company’s flagship asset is the Zeus Lithium Project (“Zeus”), located in Clayton Valley, Nevada. The Zeus Project contains a current 43-101 measured and indicated resource estimate* of 363 million tonnes grading 923 ppm lithium, and an inferred resource of 827 million tonnes grading 884 ppm lithium utilizing a 400 ppm Li cut-off. In December 2021, a robust PEA** indicated an After-Tax NPV(8) of US$1.3 Billion and IRR of 31% using US$9,500/tonne Lithium Carbonate Equivalent (LCE). Using the LCE long term forecast of US$14,000/tonne, the PEA indicates an NPV (8%) of approximately US$2.6 Billion and an IRR of 52% at US$14,250/tonne LCE.

 

Please visit our web site for further information: www.noramlithiumcorp.com

 

ON BEHALF OF THE BOARD OF DIRECTORS

 

Sandy MacDougall

Chief Executive Officer and Director

C: 778.999.2159

 

For additional information please contact:

Peter A. Ball

President and Chief Operating Officer

[email protected]

C: 778.344.4653

 

Noram Lithium Corp.

Suite 2150 – 555 West Hastings Street

Vancouver BC V6B 4N6

T: 604.553.2279

[email protected]

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements regarding, among other things, the completion transactions completed in the Agreement. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, regulatory approval processes. Although Noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable, including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities laws. *Updated Lithium Mineral Resource Estimate, Zeus Project, Clayton Valley, Esmeralda County, Nevada, USA (August 2021) **Preliminary Economic Assessment Zeus Project, ABH Engineering (December 2021).

Noram Lithium Corp. Stock

€0.12
1.260%
There is an upward development for Noram Lithium Corp. compared to yesterday, with an increase of €0.002 (1.260%).

Like: 0
Share

Comments