Menu
Microsoft strongly encourages users to switch to a different browser than Internet Explorer as it no longer meets modern web and security standards. Therefore we cannot guarantee that our site fully works in Internet Explorer. You can use Chrome or Firefox instead.

Gran Colombia Announces Results from the 2021 Drill Program at Its Toroparu Project in Guyana; Confirms 4-Km Strike Length Of Structurally Controlled High-Grade Gold Mineralized Structures


TORONTO, CANADA, Tuesday, July 6, 2021 – Gran Colombia Gold Corp. (TSX: GCM, OTCQX: TPRFF) (“Gran Colombia” or the “Company”) is pleased to announce results from the recently completed Phase 2 diamond drill program at its 100%-owned Toroparu Project in Western Guyana. The 10,494 meters Phase 2 program was designed to confirm the continuity of both the northwest oriented high-grade gold structures and the cross cutting east-west high-grade structures that create a repeatable pattern of intersecting zones amenable to underground mining methods over the 4 kilometer strike length of the Toroparu Project[i].

 

Serafino Iacono, Executive Chairman of Gran Colombia, commented, “The discovery of the structural control of high-grade gold mineralization at Toroparu has reaffirmed our confidence in the potential value of this project as one of our cornerstone assets. The recently completed, two-phase diamond drill program comprised a total of 20,750 meters in 114 drill holes and has confirmed a 4-kilometer ("km") strike length of high-grade structurally controlled gold mineralization at Toroparu. In addition, the program identified a repeated pattern of intersections of NW-SE and E-W oriented sub-vertical structures containing high-grade zones extending over mineable widths up to 100 m vertically (“jewelry boxes”)[ii] that support our belief that a high-grade resource amenable to underground mining methods lies at the core of this very large, disseminated gold deposit. We are currently working with Nordmin to prepare an updated mineral resource estimate and preliminary economic assessment (“PEA”) incorporating the high-grade results from this latest drilling program. We expect the PEA will be completed later this summer.”

 

Highlights

 

-         Assay results from the 2021 Phase 2 High-Grade Definition Drill Program extend high-grade mineralization to the northwest of historical drilling and confirm a 4-km overall strike length of Toroparu Deposit Area (Figures 1 and 2).

 

-         Drill results identify several additional concentrations of high-grade gold contained in intersecting NW-SE and E-W structures (“pipes”) that occur in a repetitive pattern across the deposit (Figure 2). These structural pipes exhibit continuity over 2 metre ("m") to 25 m widths extending over 30 to 100 vertical metres and confirm the potential for significant volumes of gold mineralization amenable to underground mining methods exists along the 4 km Toroparu Deposit Area.

 

-         The high-grade mineralized pipes, ranging in grade from approximately 5 g/t gold ("Au") to greater than 20 g/t Au over potentially mineable widths, are often surrounded by a lower grade (0.5 - 5.0 g/t Au) halo of mineralized material. (Figure 5).

 

-         The high-grade gold grades intersected in structures range from 2.42 g/t Au to 101.7 g/t Au and have a length-weighted average grade of 6.7 g/t Au (uncut) over 113 m and 76 intervals highlighted in this release (Table 1).

 

-         Since historical drilling has been limited to the upper 450 m of vertical extension of the deposit, this remains open at depth across the 4-km of strike length at depths that are relatively shallow for an underground mine. Results from the most northwest set of drill holes, which intersected multiple high-grade intervals indicate that the high-grade structural component of the deposit is still open along strike to the northwest.

 

Figure 1: 2020/2021 Drill Results

 

Map

Description automatically generated

 

2021 Phase 2 Drill Program - Drill Result Highlights (Figures 1 through 8)

 

Significant intercepts were encountered in 27 of the 42 holes drilled. Highlights of best intercepts are presented in table below:

 

Northwest Area

Hole

From (m)

To (m)

Width (m)

Weighted Avg. Au Grade (g/t)

TDP544

10.6

19.6

9.00

4.51

including

10.6

12.1

1.50

37.50

TDP549

221.9

222.8

0.98

35.80

TDP549

260.1

267.0

6.94

3.02

including

261.0

262.0

1.00

9.05

including

265.5

267.0

1.50

7.11

TDP568

27.1

40.6

13.50

2.13

including

33.1

34.6

1.50

12.40

TDP572

73.1

74.1

1.00

8.12

TDP572

90.5

91.1

0.60

8.13

TDP572

327.5

329.0

1.50

3.45

TDP572

339.0

348.5

9.50

2.02

including

340.0

341.0

1.00

3.89

including

342.5

343.0

0.50

9.41

including

345.5

346.0

0.50

10.70

TDP574

319.5

337.5

18.00

1.17

including

319.5

321.0

1.50

3.15

including

331.0

332.3

1.30

4.48

TDP574

361.5

363.1

1.55

6.58

TDP574

382.5

384.0

1.50

8.01

TDP574

420.3

422.3

2.00

27.05

including

420.3

420.8

0.50

101.70

TDP574

478.0

480.0

2.00

4.04

Main Area

TDP551

148.5

207.0

58.50

1.77

including

150.5

151.5

1.00

7.20

including

153.5

154.0

0.50

12.70

including

157.9

158.4

0.54

33.80

including

171.5

172.0

0.50

7.56

TDP551

222.0

292.8

70.80

1.13

including

240.0

241.5

1.50

2.60

including

264.5

267.5

3.00

2.99

including

268.5

269.5

1.00

3.08

including

273.5

274.5

1.00

2.65

including

276.5

279.5

3.00

3.37

TDP553

205.5

227.5

22.00

1.13

including

214.4

214.9

0.51

4.49

including

226.5

227.5

1.00

6.03

TDP553

229.1

232.1

3.00

5.21

including

229.1

229.6

0.52

15.70

TDP553

274.5

280.5

6.00

5.64

including

277.5

279.5

2.00

11.85

TDP553

292.5

297.0

4.50

13.22

including

294.0

295.5

1.50

38.10

TDP553

312.9

330.0

17.13

2.27

including

312.9

313.4

0.53

19.40

including

321.0

322.5

1.50

7.38

TDP554

67.4

102.5

35.15

1.65

including

71.5

73.5

2.00

2.62

including

81.5

83.5

2.00

3.20

including

86.5

88.5

2.00

3.15

including

96.5

98.5

2.00

7.98

TDP554

151.2

156.7

5.49

10.57

including

151.2

152.7

1.53

24.57

TDP554

284.5

285.5

1.00

2.21

TDP554

288.0

291.0

3.00

5.17

TDP558

64.0

65.5

1.50

4.83

TDP558

81.2

97.6

16.37

1.69

including

87.7

89.2

1.50

7.70

TDP558

173.8

179.8

6.00

2.70

including

176.3

177.8

1.50

8.31

TDP562

183.0

216.0

33.00

1.85

including

187.5

188.5

1.00

4.15

including

190.2

193.3

3.05

7.99

including

204.5

205.5

0.99

3.16

TDP562

304.5

314.0

9.50

1.57

including

309.0

309.5

0.50

3.13

including

310.5

312.0

1.50

4.30

TDP564

79.0

86.0

7.00

3.14

including

83.0

85.0

2.00

7.66

TDP564

107.6

163.8

56.18

1.34

including

125.9

127.0

1.12

2.81

including

130.0

131.0

1.00

4.12

including

147.0

150.0

3.00

4.24

including

161.0

163.8

2.78

5.22

 

Figure 2: Plan View of 2020/2021 Drill program and Corresponding Cross-Sections

 

Diagram

Description automatically generated

 

High-grade gold-mineralized intercepts within the deposit are associated with the occurrence of native gold, sulfides, and quartz-carbonate veins or veinlets that crosscut most lithologies except for late-stage mafic dikes. Additionally, the geologic structural model is validated by structural measurements from 2020 and 2021 oriented core measurements that indicate an orientation of NW-SE and an overprinting orientation of E-W in the Toroparu Deposit Main and Northwest Areas. Figure 3 illustrates 2020 and 2021 drill intersections greater than 5 g/t Au.

Figure 3: 2020/2021 Drilling High-Grade Intersections > 5 g/t Au

 

Diagram

Description automatically generated

 

Figures 4 through 8 present the geological model in cross-section (see Figure 2 for section locations) with results from the 2021 drill programs highlighting the continuity of gold mineralization within the high-grade NW-SE and E-W structures.

 

-         Section A–A’ includes four 2021 diamond drill holes: TPD551, TPD552, TPD562, and TPD564

 

-         Section BBincludes one 2021 diamond drill hole: TPD558

 

-         Section C-C’ includes five 2021 diamond drill holes: TPD545, TPD546, TPD547A, TPD548, and TPD555

 

-         Section D-D’ includes one 2021 diamond drill hole: TPD572

 

-         Section E-E' includes one 2021 diamond drill hole: TPD574

 

Each of these sections illustrate the high-grade NW-SE and E-W structural wireframes which are surrounded by a lower-grade halo (> 0.2 g/t Au) in the block model.  Collectively, these assay results and historically drilled intercepts confirm the Nordmin/HPX Geological Model and potential for development of Underground Resources at Toroparu.

Figure 4: High-Grade Drilling Program Cross-Section, Main Area (A-A’)

 

A picture containing diagram

Description automatically generated

 

Figure 5: High-Grade Drilling Program Cross-Section, Main Area (B-B’)

 

Chart, map

Description automatically generated

 

Figure 6: High-Grade Drilling Program Cross-Section, NW Area (C-C’)

 

Chart

Description automatically generated

 

Figure 7: High-Grade Drilling Program Cross-Section, NW Area (D-D’)

 

Chart, histogram

Description automatically generated

Figure 8: High-Grade Drilling Program Cross-Section, NW Area (E-E')

 

Chart

Description automatically generated

 

The 2021 diamond drilling program consisted of 10,494 m of drill core from 42 holes (TPD540 through TPD580) drilled to lengths of up to 640 m. Core samples for the drill program were collected over 0.5 m to 1.0 m intervals within the mineralized zone and 1.5 m intervals in the barren intervals. The sampling has been driven by sulfides content, quartz carbonate vein density, and lithological discrimination of barren mafic dikes. Half-core was submitted to MS Analytical Labs in Georgetown, Guyana for analysis. Gold was analyzed by fire assay atomic absorption reading and gravimetric reading greater than 10 ppm. A standard quality control procedure has been applied including blanks, standards, and duplicates.

 

The total cumulative diamond drilling on the Upper Puruni Concession as of July 6, 2021 is 245,693 m in 1,091 diamond drill holes (“DDH”) including 600 DDH totaling 199,223 meters drilled at Toroparu and 184 DDH totaling 21,963 m drilled at Sona Hill.

 

Qualified Persons Review

 

This release was independently prepared under the supervision of Mr. Glen Kuntz, P.Geo. (Ontario) of Nordmin Engineering Ltd., a "Qualified Person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects, who consents to the inclusion of his name in this release.

 

About Gran Colombia Gold Corp.

 

Gran Colombia is a mid-tier gold producer with a proven track record of mine building and operating in Latin America. In Colombia, the Company is currently the largest underground gold and silver producer with several mines in operation at its high-grade Segovia Operations. In Guyana, the Company is advancing the Toroparu Project, one of the largest undeveloped gold projects in the Americas. Gran Colombia also owns approximately 44% of Aris Gold Corporation (TSX: ARIS) (Colombia – Marmato), an approximately 27% equity interest in Denarius Silver Corp. (TSX-V: DSLV) (Spain – Lomero-Poyatos; Colombia – Guia Antigua and Zancudo) and an approximately 26% equity interest in Western Atlas Resources Inc. (TSX-V: WA) (Nunavut – Meadowbank).

 

Additional information on Gran Colombia can be found on its website at www.grancolombiagold.com and by reviewing its profile on SEDAR at www.sedar.com.

 

Cautionary Statement on Forward-Looking Information

 

This news release contains "forward-looking information", which may include, but is not limited to, statements with respect to anticipated business plans or strategies, including exploration programs and mineral resources and reserves. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Gran Colombia to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Factors that could cause actual results to differ materially from those anticipated in these forward-looking statements are described under the caption "Risk Factors" in the Company's Annual Information Form dated as of March 31, 2021 which is available for view on SEDAR at www.sedar.com. Forward-looking statements contained herein are made as of the date of this press release and Gran Colombia disclaims, other than as required by law, any obligation to update any forward-looking statements whether as a result of new information, results, future events, circumstances, or if management's estimates or opinions should change, or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.

 

For Further Information, Contact:

 

Mike Davies

Chief Financial Officer

(416) 360-4653

[email protected]

 

In Europe:

Swiss Resource Capital AG

Jochen Staiger

[email protected]

www.resource-capital.ch

 

 


[i] As described in Gold X February 23, 2021 and March 23, 2021 news releases.

[ii] Gold X March 22, 2021 News Release: Gold X Updates Toroparu High-Grade Geologic Model

Aris Mining Corp. Stock

€3.85
-5.370%
Heavy losses for Aris Mining Corp. today as the stock fell by -€0.220 (-5.370%).

Like: 0
Share

Comments